Flag

Hon'ble Chief Minister

Shri Devendra FadnavisShri. Devendra Fadnavis Hon'ble Chief Minister & Chairman, MMRDA

 
 

Hon'ble Chief Minister, Government of Maharashtra is Chairman of the Authority, which is the highest policy making body of MMRDA. It consists of 17 members.


 

Media Gallery

  • Click to View Photo Gallery
  • Click to View Video Gallery

Tender Notice & Vacancies

Admin Click here for Recruitment, Results etc.

18-12-2018

Other Appointment of an agency for Providing the Labour Services to MNPS.

15-12-2018

Metro PIU Design and Construction of Elevated Viaduct and Nine (9) Elevated Stations (excluding architectural finishes and PEB roof structure) including Two (2) flyovers, and Underground Twin Tunnel, Cut and Cover, Ramp and One (1) Underground Station (including architectural finishes and PEB structures) for corridor of Mumbai Metro line 9 i.e. Extension of Line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai Metro Rail Project of MMRDA.

14-12-2018

T&C "Invitation of EOI for Urban Design, Traffic System Design including Access Control on Western Express Highway along with Signal free junctions for Enhanced traffic flow."

12-12-2018

T&C Extension of proposal Submission date for ‘ Selection of Financial Institution for Transaction acquiring and card issuance services for Integrated Ticketing System in Mumbai Metropolitan Region (MMR).'

11-12-2018

L& E Cell Inviting e-RFP for Setting up a Temporary Marquee Event Venue of International Standards and Managing, Promoting, Ticketing and Curating Events, Functions, Conferences, etc. in G-Block of BKC (MMRDA Ground), Bandra (East), .

10-12-2018

Engineering Annual Maintenance of MMRDA's Old Office Building at Bandra (E) and office premises at CR-2 (Nariman Point), Balkum (Thane) and Kalyan (West).

08-12-2018

Metro PIU Design, Verification, Supply, Installation, Testing and Commissioning of Traction and Auxiliary Power Supply and SCADA for Metro Line-7 (Andheri East - Dahisar East) of Mumbai Metro Rail Project of MMRDA (Package No. CA-58).

08-12-2018

Metro PIU Design, Verification, Supply, Installation, Testing and Commissioning of Overhead Traction System for Metro Line-7 (Andheri East - Dahisar East) of Mumbai Metro Rail Project of MMRDA (Package No. CA-59).

07-12-2018

Admin AMC for Commissioner office EPABX telephone Systems.

07-12-2018

Metro PIU Modifications of HT Lines of TATA Power for proposed Metro Line 4 at chainage 16580.00 Project.( I) Height raising/shifting of 220 kV M/C Trombay- Salsette 1 & 2 & 220 kV Kalyan-Salsette 3 & 4 line at Shangrilla. (II) Height raising/shifting of 220 kV M/C Trombay-Dharavi- Salsette & 110 kV Dharavi-Vikroli & Dharavi-Powai line at Shangrilla. (III) Height raising/shifting of 110 D/C Kalyan-Kalwa-Salsette line at Shangrilla.(CA-52)

Metropolitan Commissioner

Shri R. A. RajeevShri. R. A. Rajeev, IAS, Metropolitan Commissioner, MMRDA

 

Metropolitan Commissioner is an appointee by the Government of Maharashtra. He heads the office of MMRDA which consists of the functional Divisions namely Engineering, Finance & Accounts, Planning, Town & Country Planning, Transport & Communications.

About MMR

Basic information about Mumbai Metropolitan Region (MMR)