Transport
- Multimodal Corridor from Virar to Alibaug
- Metro Line - 1
- Metro Line - 2A
- Metro Line - 2B
- Metro Line - 4
- Metro Line - 5
- Metro Line 6
- Metro Line - 7
- Metro Line - 9
- Mumbai Monorail
- Mumbai Trans Harbour Link
- Mumbai Trans Harbor Link – Metro Link
- Mumbai Urban Transport Project
-
Mumbai Urban Transport
Project - || - National Mass Transit Training and Research Institute
- Comprehensive Transport Study
- InterState Bus Terminal
- UMMTA
Infrastructure
Environment
Innovations
International Financial Services Centre
eGovernance
Development Finance
Social Development / R&R
Additional
Mumbai Metro Line 1 (Versova-Andheri-Ghatkopar Metro Project)
- Versova-Andheri-Ghatkopar corridor is 11.40 km elevated corridor.
- It provided connectivity of Eastern & Western suburbs to Western & Central Railway.
- Facilitates smooth and efficient interchange between suburban rail system and MRT System at Andheri and Ghatkopar Stations.
- Reduced the Journey time from 71 minutes to 21 minutes, between Versova and Ghatkopar.
- Provide rail based access to the MIDC, SEEPZ and commercial developments.
Project Features
1 | Route length | : | 11.40 km (Elevated) |
2 | Number of Total Station | : | 12 |
3 | Platform Length | : | 135 m (6 Coaches) |
4 | Car Depot | : | D. N. Nagar |
5 | Length of Coach | : | 22 m |
6 | Max. Speed | : | 80 kmph |
7 | Average Speed | : | 35 kmph |
8 | Seating Arrangement | : | Parallel to Coach |
9 | 4 Coach Capacity 6 Coach Capacity | : : | 1178 Passengers 1792 Passengers |
10 | Estimate Ridership | : | 2021- 6.65 lakhs per day (PHPDT - 23,321) 2031- 8.83 lakhs per day (PHPDT - 30,491) |
11 | Environment in Coach | : | Air Conditioned |
12 | Ticketing System | : | Automatic Collection |
13 | Interchange facilities | : |
|
Details of Project
Project Name | Versova-Andheri- Ghatkopar Metro Corridor (Fully Elevated) |
Format | PPP (Public Private Partnership) |
Project Implementing Agency | Mumbai Metro One Private Limited |
SPV | Mumbai Metro One private Limited (MMOPL) a Special Purpose Vehicle (SPV) has been incorporated jointly by Mumbai Metropolitan Region Development Authority (MMRDA), Reliance Energy Limited (REL) and Veolia Transport France for implementation, operation and maintenance of Mass Rapid Transport System (MRTS) along Versova- Andheri- Ghatkopar (VAG) corridor.. |
Total project completion cost | Rs. 2,356 cr. |
VGF | Rs. 650 cr. |
Implementation period | 2007-2012 (As per Concession Agreement) |
Stations from Versova to Ghatkopar :
Sr. No. | Station Name |
1 | Versova |
2 | D. N. Nagar |
3 | Azad Nagar |
4 | Andheri |
5 | Western Express Highway |
6 | Chakala |
7 | Airport Road |
8 | Marol Naka |
9 | Sakinaka |
10 | Asalpha Road |
11 | Jagruti Nagar |
12 | Ghatkopar |
Present Status
The work of Metro Line-1 project is completed and opened for public use on 8th June, 2014. The average daily ridership is approximately 3 Lacs.
Photo Gallery
Other Information
The Concession Agreement of Metro Line-1 :
- Schedule IV A (49.1 kB)
- Schedule IV B (94 kB)
- Schedule IV C (105 kB)
- Volume 1 (3.77 MB)
- Volume 2 (1.96 MB)
- Volume 2B - Drawings (2.21 MB)
- Volume 3A - Performance Requirements (6.90 MB)
- Volume 3B - Performance Requirements (5.07 MB)
- Technical Proposal Volume 1 (70.7 MB)
- Technical Proposal Volume 2 (14.8 MB)
- Financial Proposal (16.8 MB)