Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 341 | Construction of Cement Concrete Road to approach to Building No. 3 as per Sanctioned DP Plan of SRA Scheme at Bhandary Metallurgy Kurla under Extd MUIP. | Download(190.63 KB) |
|
| 342 | Appointment of Contractor for Construction of Linkway FOB at Metro Line-7 Station – Package 3 - (1) Poisar Metro Station Connecting Samata Nagar | Download(392.27 KB) |
|
| 343 | Operation & Maintenance Parking lot at CS No. 501(Pt.), Near Dharavi Bus Depot, Opp. to Maharashtra Nature Park, Dharavi, Mumbai. | View Detail | |
| 344 | Result for the post of Steno Typist exam held on 8th March, 2019 | Download(716.75 KB) |
|
| 345 | Recruitment for the post of Senior Community Development Officer | Download(850.31 KB) |
|
| 346 | Exam date and syllabus for the post of "Transportation Engineer". | Download(458.26 KB) |
|
| 347 | Notice w.r.t. Declaration of Intention under MR & TP Act, 1966 to prepare Town Planning Scheme for the area of Kalyan Growth Centre. | Download(7.42 MB) |
|
| 348 | Engaging Junior Engineer (Civil/Electrical/Signaling & Telecommunication/Track) | Download(731.47 KB) |
|
| 349 | Invitation for Empanelment of Graphic Designers | Download(185.07 KB) |
|
| 350 | Result for the post of Telephone operator | Download(350.62 KB) |
|
| 351 | Result for the post of Dy.Accountant | Download(1.11 MB) |
|
| 352 | Engagement of ‘Detail Design Consultant’ (DDC) and 'General Consultant' (GC) respectively for Metro Line-5 Thane-Bhiwandi-Kalyan of Mumbai Metro Rail Project of MMRDA, Mumbai | Download(38.18 KB) |
|
| 353 | Result for the post of Executive Engineer, Dy. Engineer-I, Jr. Engineer of Signalling & Telecommunication, Electrical and Track. Exam Dt. 22.12.2017 | Download(297.79 KB) |
|
| 354 | Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1) | Download(7.4 MB) |
|
| 355 | A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East) | Download(46.95 KB) |
|
| 356 | Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC) | Download(1.86 MB) |
|
| 357 | Annual rate contract of xerox copies items for the year 2017-18 | Download(50.98 KB) |
|
| 358 | Minutes of Pre-Bid Meeting held on 29-03-2017 for Appointment of a Consultant for Realizing the “Kalyan Growth Centre” by Preparing Town Planning Schemes for Phase-1 & Phase-2 | Download(201.86 KB) |
|
| 359 | Design, Construction, Manufacturing, Supply, Installation, Testing, Commissioning of Ballastless Trackwork in Mainline for Line-7 Corridor {Andheri (East)-Dahisar (East)} of Mumbai Metro Rail Project of MMRDA, Mumbai. (Approx. Ch. -525.903 to Ch.15446.475 | View Detail | |
| 360 | "Engagement of ‘Detail Design Consultant’ (DDC) for Metro Line-5 Thane-Bhiwandi-Kalyan of Mumbai Metro Rail Project of MMRDA, Mumbai". Addendum No. 01 | View Detail |





