inner-banner

Archive What's New/Events

Sr. No. Title Published Date Download/Details
481 Bids for carrying out the construction of PAP tenements in proposed S. R. Scheme under Clause 3.11 read with clause 3.5 & 3.19 (ii) of Appendix-IV of DCR 33 (10) on the land bearing CTS no. 319/B, 343, 346, 347, 352 & 354 of village Dahisar (West). Corrig View Detail
482 Bids for carrying out the construction of PAP tenements in proposed S. R. Scheme under Clause 3.11 read with clause 3.5 & 3.19 (ii) of Appendix-IV of DCR 33 (10) on the land bearing CTS No. 319/B, 343, 346, 347, 352 & 354 of village Dahisar (West). Corrig View Detail
483 Design and Construction of South bound flyover at the junction of ANDHERI-GHATKOPAR LINK Road on Eastern Express Highway (EEH), Mumbai. Corrigendum No. 01 View Detail
484 Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1) Download(7.4 MB)Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1)
485 Bids for carrying out the construction of PAP tenements in proposed S. R. Scheme under Clause 3.11 read with clause 3.5 & 3.19(ii) of Appendix-IV of DCR 33(10) on the land bearing CTS no. 319/B, 343, 346, 347, 352 & 354 of village Dahisar (West). Corrigen View Detail
486 Recruitment for the post of Surveyor and Court Clerk Download(199.32 KB)Recruitment for the post of Surveyor and Court Clerk
487 Techno-Economic Feasibility and Bid- Process Management for Commercial Development in Wadala Monorail Depot Area, Mumbai (Addendum 3) View Detail
488 DRAFT TENDER DOCUMENT-MS01 Mumbai Metro : Inputs/comments on draft Tender MS01Documents for Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control & Signalling and Telecommunication System for Mumbai Metro Line 2A, 2B and 7 Download(1.11 MB)DRAFT TENDER DOCUMENT-MS01 Mumbai Metro : Inputs/comments on draft Tender MS01Documents for Design, Manufacture, Supply, Installation, Testing and Commissioning of Train Control & Signalling and Telecommunication System for Mumbai Metro Line 2A, 2B and 7
489 A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East) Download(46.95 KB)A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East)
490 Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC) Download(1.86 MB)Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC)
491 Minutes of Pre-Bid Meeting held on 13th April, 2017 for "Supplying/Providing cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A" Download(398.76 KB)Minutes of Pre-Bid Meeting held on 13th April, 2017 for "Supplying/Providing cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A"
492 Annual rate contract of xerox copies items for the year 2017-18 Download(50.98 KB)Annual rate contract of xerox copies items for the year 2017-18
493 Supplying cranes as required by Traffic Police Department for relief from traffic congestion on Western Express Highway for Metro Line 7 & 2A. Corrigendum No. 01 View Detail
494 Minutes of Pre-Bid Meeting held on 29-03-2017 for Appointment of a Consultant for Realizing the “Kalyan Growth Centre” by Preparing Town Planning Schemes for Phase-1 & Phase-2 Download(201.86 KB)Minutes of Pre-Bid Meeting held on 29-03-2017 for Appointment of a Consultant for Realizing the “Kalyan Growth Centre” by Preparing Town Planning Schemes for Phase-1 & Phase-2
495 Implementation of Station Area Improvement Schemes within the influence area of Monorail Stations along SGM Chowk – Wadala(Phase-II) corridor. Package I, Package II, Package III Download(63.52 KB)Implementation of Station Area Improvement Schemes within the influence area of Monorail Stations along SGM Chowk – Wadala(Phase-II) corridor. Package I, Package II, Package III
496 Supply of Protable cabin for ticket booking office and other structure near park for Metro Line-7 (Package-3) Download(93.59 KB)Supply of Protable cabin for ticket booking office and other structure near park for Metro Line-7 (Package-3)
497 Expression of interest providing of residential flats on lease basis in Mumbai Download(326.89 KB)Expression of interest providing of residential flats on lease basis in Mumbai
498 Pre qualification for Mumbai Trans Harbour Link Project. Addendum No . 02 (Tender No. 503) View Detail
499 Appointment of Consultant for feasibility study, preparation of Detailed Project Report and Project Management Consultancy for the work of “Widening and Construction of existing Akurli Subway on Western Express Highway.” Download(53.72 KB)Appointment of Consultant for feasibility study, preparation of Detailed Project Report and Project Management Consultancy for the work of “Widening and Construction of existing Akurli Subway on Western Express Highway.”
500 Providing/Supplying of road, signage’s boards required for safe traffic for relief from traffic congestion for Metro Project Line‐ 7 & 2A (Package-I & II). Corrigendum No. 03 View Detail
×

Rate Your Experience