inner-banner

DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF 220 kV RECEIVING SUBSTATION INCLUDING 220 kV 33kV and 25kV CABLING WORK COMPLETE 25kV OVERHEAD CATENARY SYSTEM ALONGWITH SWITCHING STATION 33kV AUXILIARY POWER

Division: Metro PIU
Type: Notice
Date of Issue:
Valid Upto: