Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6
Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6 Swami Sam
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF 220 kV RECEIVING SUBSTATION INCLUDING 220 kV 33kV and 25kV CABLING WORK COMPLETE 25kV OVERHEAD CATENARY SYSTEM ALONGWITH SWITCHING STATION 33kV AUXILIARY POWER
Design manufacture supply install integrate test and commission rolling stock signaling train control telecommunication platform screen doors and depot machinery for Mumbai Metro Rail Project Line 5 with 15 years of maintenance
Inviting Expression of Interest EOI In Principle Sanction for provision of Rupee Denominated Loan of Up to Rs 4000 Crore to the MMRDA for the development of SR Project in Ramabai Ambedkar Nagar
Deliver comprehensive solutions for Mumbai Metro Line 6 covering power supply traction E and M lifts escalators and 15 years maintenance post defect liability MMRDA project System Package 2 CA 233 Swami Samarth Nagar to Vikhroli EEH
Provide end to end solutions for Mumbai Metro Line 6 including rolling stock signaling communication platform screen doors depot machinery and 15 years of maintenance post defect liability period. MMRDA project. Swami Samarth Nagar to Vikhroli EEH
Inviting Expression of Interest EOI In Principle Sanction for provision of Rupee Denominated Loan of Up to Rs. 4000 Crore to the MMRDA for the development of S.R.Project in Ramabai Ambedkar Nagar
Regarding MC office AMC I AMC II office Director Metro PIU and JMC Office EPBAX Annual Maintenance and Repair contract in New MMRDA Building I year rate contract