Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6
Design Manufacture Supply Installation Integration Testing and Commissioning of Rolling Stock Communication Based Signaling and Train Control Telecommunication Platform Screen Doors Systems and Depot Machinery and Plant including 15 Years of Comprehen
Appointment of Architectural and Project Management Consultancy for Slum Rehabilitation Scheme under reg 33 10 of MCGM DCPR 2034 at Ramabai Ambedkar Nagar Ghatkopar East on plot bearing CTS No 194 part and 195 part in Mumbai
RFP for Selection of System Integrator SI for Design Development and Implementation of Regional Information System for Mumbai Metropolitan Region and Urban Observatory at Mumbai Metropolitan Regional Development Authority Mumbai
RFP for Selec on of System Integrator SI for Design Development and Implementa on of Regional Informa on System for Mumbai Metropolitan Region and Urban Observatory at Mumbai Metropolitan Regional Development Authority Mumbai.
Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6
Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6 Swami Sam
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF 220 kV RECEIVING SUBSTATION INCLUDING 220 kV 33kV and 25kV CABLING WORK COMPLETE 25kV OVERHEAD CATENARY SYSTEM ALONGWITH SWITCHING STATION 33kV AUXILIARY POWER
Design manufacture supply install integrate test and commission rolling stock signaling train control telecommunication platform screen doors and depot machinery for Mumbai Metro Rail Project Line 5 with 15 years of maintenance