संग्रहण प्रसिध्दीपत्रक आणि प्रकाशित बातम्या
| Sr. No. | Title | Start Date | End Date | Download/Details | Category |
|---|---|---|---|---|---|
| 101 | Dindoshi and Rashtriya Udyan FOBs Commissioned in the service, MMRDA ensuring last mile connectivity with MMI. | 15-05-2023 | 15-05-2024 | Download(2.31 MB) |
बातम्या |
| 102 | Two new corridors will reduce traffic congestion of Mumbai Suburbs. | 10-05-2023 | 10-05-2024 | Download(3.16 MB) |
बातम्या |
| 103 | Metro line 4 achieves 49% Physical Work Completion | 10-05-2023 | 10-05-2024 | Download(740.86 KB) |
बातम्या |
| 104 | Last Girder of Airoli side in the phase -I of Airoli-Katai Naka Project launched | 05-04-2023 | 05-04-2024 | Download(13.43 MB) |
बातम्या |
| 105 | State of art Mandale depot Metro Simulator building completed | 28-03-2023 | 28-03-2024 | Download(627.61 KB) |
बातम्या |
| 106 | President of JICA Visits Engineering Marvel & Growth Driver of Mumbai MTHL | 16-03-2023 | 16-03-2024 | Download(1.55 MB) |
बातम्या |
| 107 | 154th Authority Meeting (Budget) chaired by Hon’ble Chief Minister attended by Hon’ble Dy.Chief Minister and Senior Officials. | 16-03-2023 | 16-03-2024 | Download(833.48 KB) |
बातम्या |
| 108 | Exhibition of various medicinal and flowering plants at Maharashtra Nature Park Society | 13-03-2023 | 13-03-2024 | Download(139.53 KB) |
बातम्या |
| 109 | MMRDA Celebrates International Women's Day | 13-03-2023 | 13-03-2024 | Download(472.89 KB) |
बातम्या |
| 110 | Mainstreaming Gender By MMRDA In Mumbai Metro | 13-03-2023 | 13-03-2024 | Download(963.4 KB) |
बातम्या |
| 111 | 3 tier station of metro line 9 is 65% completed | 13-03-2023 | 13-03-2024 | Download(1.09 MB) |
बातम्या |
| 112 | 1st composite steel girder span erected at Sewri side in MTHL project | 22-02-2023 | 22-02-2024 | Download(1.28 MB) |
बातम्या |
| 113 | Hon. Chief Minister Shri. Eknath Shinde Inaugurated Kopri ROB | 14-02-2023 | 14-02-2024 | Download(1.66 MB) |
बातम्या |
| 114 | Hon. Prime Minister Inaugurated MMRDA's another two important infrastructure projects just after Metro | 14-02-2023 | 14-02-2024 | Download(3.45 MB) |
बातम्या |
| 115 | Mumbai's First North-South & East-West Connectivity 66% Complete | 14-02-2023 | 14-02-2024 | Download(628.97 KB) |
बातम्या |
| 116 | Surya Regional Water Supply Scheme is on the verge of completion. | 01-02-2023 | 01-02-2024 | Download(2.12 MB) |
बातम्या |
| 117 | Tunnel (LHS) in Parsik Hills was opened from both sides using a controlled blasting method In the presence of the Hon. Chief Minister | 30-01-2023 | 30-01-2024 | Download(1007.52 KB) |
बातम्या |
| 118 | A Million plus commuters travelled within a week on Metro 2a and 7 since it was inaugurated by Hon. Prime Minister of India | 30-01-2023 | 30-01-2024 | Download(1.2 MB) |
बातम्या |
| 119 | Civil Work of Lt. Balasaheb Thackeray Rashtriya Smarak 65 % Completed | 25-01-2023 | 25-01-2024 | Download(796.7 KB) |
बातम्या |
| 120 | MUMBAI METRO LINES 2A AND 7 (PHASE 2) DEDICATED TO MUMBAIKARS BY HON. PRIME MINISTER SHRI. NARENDRA MODI | 20-01-2023 | 20-01-2024 | Download(4.59 MB) |
बातम्या |





